Dear Gurus,

 

Can system be configured like based on stage of the Product-workcentre wise BOM consumption can be made?

As of now we have final back flushing at the final reporting point.

 

This requirement had been raised as we practice MES & data is requested for the pull of BOM at concurrent workcentre (stage wise) to track in MES.

Data flow will be between SAP & MES software for Management Information System (MIS).

 