Dear Gurus,
Can system be configured like based on stage of the Product-workcentre wise BOM consumption can be made?
As of now we have final back flushing at the final reporting point.
This requirement had been raised as we practice MES & data is requested for the pull of BOM at concurrent workcentre (stage wise) to track in MES.
Data flow will be between SAP & MES software for Management Information System (MIS).
Thanks in advance.
Vignesh.V