Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8635

Re: Sampling procedure selection for production order (different PO type) when GR

$
0
0

Hi,Dear all,

Thanks for your answer .

Sorry.My question havn't got any good solution.

 

My question is  when GR from prodution ,I need the material from different production type to get the different sampling procedure.

For One matereial A , REM product , active the QM view with  inspection type 04

 

when GR(MVT 131) from REM  repetitive mfg production  ,I need 5% inspection sample.

But for some rework order which discrete prodution  production type ZPP1  ,

when GR(MVT 101) from discrete prodution  ,I need 100% inspection sample.

 

 

At present ,No matter what,when  GR from production ,the inspection Sample is 5%,both the REM and the Discrete production.

 

 

BUT  Inspection type 13 is for In-process insp. for repetitive mfg something like inspection type03

I know that give the material A a inspection type 03 ,IPQC for the last operation a quality inspection for the rework order in discrete production avialiable.But it hope a good one.

 

BR

 

Miriam Zhao


Viewing all articles
Browse latest Browse all 8635

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>