Hi Rishav

 

You cannot schedule preliminary import jobs from SCMA (task list)....see the second picture in my first post.

 

I wouldn't want to do this anyway as the whole point of preliminary import is to do this ad-hoc when a transport needs to migrate outside of the project boundaries. That's probably why you can't do this via the task list.

 

I agree a job needs to be scheduled. I checked the preliminary import to TEST and PROD and the action in charm automatically triggers the job:

 

PI4.JPG

 

So I need something similiar for PreProd. Except the parameter (see above screenshot) will be different for each system (ECC, SRM, CRM etc.). So I'm not sure how to link a program name to an action in ChaRM and how it can pick the correct parameter depending on the system it needs to go to. Is this even possible?

 

I believe status driven import is simply a setting to say "this transport is ok to go to this system as long as ChaRM is in this status". Please correct me if I'm wrong but I can't see this being relevant to Preliminary import in anyway? If I'm wrong, can you please send me more detail.

 

Thanks
Shaun