Re: Planned Delivery Time and Minimum Lot size and Rounding value

$
0
0

Many thanks YRS

 

2) do i need to maintain MOQ and rounding value in both product A and Product B ?

 

Yes ,you have to maintain the lot size and rounding value as per the packing contraints of the business not same as B since B is procured externally and constraints of the supplier need not be the same as business.

 

Question to you

 

well in my case the MOQ and rounding value is for the product B from supplier

what ever  i received from supplier should be packed based on the supplier PO

 

please take note demand is based on Product A not product B

 

Is that ok to maintain product B,s value   MOQ and Rounding value in product A too

so that demand of Product A passed to product B so that there wont be inconsistency

 

what i am trying to achieve is what ever i procured from supplier should be packed

which mean both supplier PR and Subcontracting PR should be same

 

Regards

Raj