Hi,
We are performing a SPS upgrade in our ECC 6.0 systems. We have done that in our Sandbox, DEV, QAS.
We wanted to know if anyway could be taken to skip the SPDD and SPAU automatically without manual intervention
(meaning we don't need to switch to dialog and then skip the SPDD or SPAU screen).
The reason we wanted to do this is to reduce any manual intervention required at the dialog level and let it run at background until all SPS package is completed successfully.